ORDER
work order here
1. boss put project post for the links here. (step 3 of pro pro order)
2. designer draw story boards, post link to file.
3. designer reply post is link to drawn story boards. (step 1 and 2 of link flow)
4. artist get file, adds color to story board, post link to new file.
5. artist reply post is link to colored story boards. (setp 3 of link flow)
6. animator get new file, makes animatic, post link in project sub forum.
7. animator reply post is link to animatic, (can be posted in the project post in the project sub forum).
work order pro pro
1. project or prospal gets posted in project sub.
2. time line gets posted in time sub.
3. space for links for project gets posted in link sub.
4. list of team/crew gets posted in the team sub.
5. ideas get posted in brain storm sub.
6. work flows get work done. (start use of the work flows above)